In
view of the global business trends of outsourcing
and
the need to focus on core competencies:Torque aligns
with organizations on strategic ICT projects in the
areas of turnkey Telecoms services, network mergers,
domain consolidations, Infrastructure Cost Reduction,
Project
Managment and consultancy Solution and also supply
of Networks and Telecoms equipments
|
|
Major
Telecoms Projects and Services between 2005 to Date |
|
Telecommunications Project Managment
and Consultancy Services
- Technical Audit/Business Advisory service
on prospective Indegenous Private Telephony Operator
(PTO)
- Project managment and Technical
Consultancy on service roll-out of Indengous Private
Telephony operator in Nigeria
|
| |
|

|
Lagos to
Kano Optical Fibre Backbone Project
- Deployment of fibre optic cable along
the railway track from Lagos
to Ibadan
- Over 35km of excavation and Laying
of cables
- Civil works included excavation of roads,
thrustborrowing, asphalting and concreting along the
various routes
- employed over 300 men for the duration
of the project
|
| |
|

|
Fiber Optic
and Copper Deployments (Through
our sister company ATOZ services)
- August 2006: Supply, splicing and installation
of 48 core fiber optic cables at MTN Abuja
- March 2006:Supply and installation of
500pair copper cables at MTN Benin Switch
- Over 20 Copper and fiber optic Deployments
projects from September 2002 to date
|
| |
|
|
|
Fiber
Optic Interconnectivity between Globacom and MTN Ibadan
- 18km of 96 core Fiber Optic cable for
interconnectivity between the two GSM operators
- Civil works included Excavation, Laying
and asphalting of road
- Fusion Splicing and OTDR testing activities
|
| |
|
|
|
Deployment
of Tie Cables for MTN Nigeria (copper voice cables)
- 18 locations nationwide (for the purpose
of tie cables between MTN switches)
- Civil works included excavation, laying
of voice cables and restoration of excavated areas
- Terminiation of cable on Krone blocks
and testing of connectivity.
|
| |
MECADON Engineering
Limited
Mr.David Ekeng
Mobile:08034711683
|
Turnkey Site Builds for Vmobile: - Ref
sites: LAG854, EDO023, EDO024, EDO026.
- Completed by: November
2005
|
| |
|
ABIDE Telecoms Ltd
Mr. Tope Agbelusi
08034060889 |
Installation of MTN towers:
• 35m tower Ikeja
• 70m tower Bauchi
• 55m tower Maiduguri
• 45m tower Maiduguri
• Completed by: July 2005
Turnkey site Build MTN:
• TX4005 (Uke town, Anambra)
Completed by: September 2005
|
| |
|
HATFEILD Consult
Limited
Mr.Segun Allison
08023207300 |
Civil Works for Vmobile Site:
LAG 695, LAG 835
Completed by: December 2005 |
| |
| Major
Network Projects and Services between 2006 to Date |
|
Supply of Cisco Devices
- Supply of Routers and switches : Cisco
Catlysts switches
|
| |
|

|
MPLS
Project –MTN Communications Nigeria .
- Project
value of over 3 Billion Naira
- In
partnership with Dimension Data and
Cisco
- First project of its kind in Sub-Saharan
Africa
- High end Network Equipment
Deployment to 12 keys cities across Nigeria
|
| |
|
Sturctured Cabling
Services - Transcorp site (Alfred Rewane):
Deployment of 160 point (data, voice and power)
- Deployment
of data points to 3 BAT(British American
Tobacco) sites
|